Renowned Renovation Official 2019 Dallas NARI Contractor of the Year for Entire House $250,000 – $500,000 Remodel
[twenty20 img1=”11133″ img2=”11132″ offset=”0.5″ hover=”true”]
The owners wanted to update this penthouse condo to have an open floor plan, raised ceilings, new kitchen, new bathrooms with tile floors, new hardwood floors throughout the entire home and lots of storage space. Renowned Cabinetry custom designed all the cabinets including the entertainment center that converts the living room into a guest room with the push of a button the Zoom-Room Remote Control.
[twenty20 img1=”11133″ img2=”11132″ offset=”0.5″ before=”After” after=”Before” hover=”true”]
[twenty20 img1=”11128″ img2=”11129″ offset=”0.5″ before=”After” after=”Before” hover=”true”]
This NARI award-winning remodeling project involved innovative use of materials: Exposed Concrete Beams/Columns, Waterfall Countertops, Floating Shelves matched to the Hardwood Flooring, multiple flooring transitions, intricate Tile Work, and Custom Cabinetry. The finished home features Cambria Surfaces, DuChateau Hardwoods, fixtures by WaterWorks, TruStile Doors, Hunter Douglas Window Fashions, Zoom-Room, and Renowned Custom Cabinetry.Renowned specializes in high-quality Kitchen and Bathrooms renovations, Cabinetry and Hunter Douglas Window Fashions. Please call to schedule a free in-home estimate or an appointment at our Highland Park showroom or email info@RenownedRenovation.com for more information.
The floors are DuChâteau’s The Riverstone Collectionâ„¢, which is an evolution of hand-sculpted hardwood flooring that blends beautifully with interiors old and new. The natural distressing and raised knots give the floors a raw and organic contour that feels comforting beneath the feet. The DuChâteau®, The Riverstone Collectionâ„¢ effortlessly merges modern and rustic design to create a truly original and inspiring floor.
Living Room After Remodeling
Zoom-Room Remote Controlled Murphy Bed
[twenty20 img1=”11474″ img2=”11473″ offset=”0.5″ before=”Closed” after=”Open” hover=”true”]
[twenty20 img1=”11474″ img2=”11473″ direction=”vertical” offset=”0.5″ before=”Closed” after=”Open” hover=”true”]
Kitchen After Remodeling
Master Bathroom
Laundry Room
Du Chateau Danbe Hardwood Floors
Tile Floors
The owners wanted to update their condo with an open floor plan, raised ceilings, new kitchen, new bathrooms and tile floors, and a new multi-use living room with hardwood floors.
The client engaged SHM Architects to take their vision, design a new layout, and create the permit-ready plans .
Working closely with the owners, the city, the Homeowners Association (HOA) and the property management team Renowned Renovation ensured all the plans, permits, and work complied with rules and regulations to deliver a well-built home with meticulous detailing and high-end materials. Our project management app, BuilderTrend keep everyone in the loop and help create little or no stress for the owners. We completed the condo remodeling project on schedule and in the budget.
In compliance with the Condo HOA rules, remodeling work could only occur on weekdays, between 9 o’clock in the morning and 5 o’clock in the evenings. Everything that had to be removed or installed had to be scheduled and highly coordinated because there were limited street-only parking and there was no storage area. Everything had to be moved in and out using a 6′-by-6′ elevator 15 stories each way. We took many elevator rides during this high rise condo remodeling project on schedule and in the budget.
In compliance with the Condo HOA rules, remodeling work could only occur on weekdays, between 9 o’clock in the morning and 5 o’clock in the evenings. Everything that had to be removed or installed had to be scheduled and highly coordinated because there were limited street-only parking and there was no storage area. Everything had to be moved in and out using a 6′-by-6′ elevator 15 stories each way. We took many elevator rides during this high rise condo remodeling project!
One challenging element of remodeling this high-rise condo was that the owners wanted to raise the ceilings as high as was possible which required that we replace most of the legacy wiring, fixtures, and the air conditioner ducts needed for the new HVAC system to effectively heat and cool the home. One challenge we discovered after the demo was to achieve the open kitchen concept it was necessary to move a roof drain. We entrusted it to Houston Roofing, who has provided quality residential and commercial roofing services for decades. To obtain approval we needed an engineering assessment, code compliance expert, variance from the City of Dallas, approval from the HOA, coordination with HOA’s roofers, coring a new hole in the roof deck, and finally plumbing the new roof drain location.
The owners’ selection of materials, fixtures, appliances, furniture-grade custom cabinets, and the remote-controlled hideaway Murphy bed reflected their desire for function, luxury, durability, and style.
It was a pleasure working with and installing leading-edge products like Hunter Douglas Window Fashions, Cambria Surfaces, DuChateau Wood Flooring,Fixtures by WaterWorks, TruStile Doors, and Renowned Cabinetry